|
|
| LOT 124-125 Off Airport Road |
| Introduction | Type | Specifications | Floor Plan | Contact |
| Sublot | Survey Lot | Type | Land Area Sq.M
|
Land Area Points
|
Selling Price
(RM)
|
![]() |
| 1 | 737 | Detached Lot | 1035.8 | 25.6 | SOLD | |
| 2 | 738 | Semi-Detached | 461.9 | 11.4 | SOLD | |
| 3 | 739 | Semi-Detached | 544.0 | 13.4 | SOLD | |
| 4 | 740 | Semi-Detached | 507.6 | 12.5 | SOLD | |
| 5 | 741 | Semi-Detached | 419.9 | 10.4 | SOLD | |
| 6 | 742 | Semi-Detached | 419.9 | 10.4 | SOLD | |
| 7 | 743 | Semi-Detached | 524.3 | 13.0 | SOLD | |
| 8 | 744 | Terrace Corner | 345.0 | 8.5 | SOLD | |
| 9 | 745 | Terrace (Intermediate) | 189.0 | 4.7 | Reserved | |
| 10 | 746 | Terrace (Intermediate) | 188.9 | 4.7 | 293,000 | |
| 11 | 747 | Terrace (Intermediate) | 189.0 | 4.7 | 293,000 | |
| 12 | 748 | Terrace (Intermediate) | 188.9 | 4.7 | SOLD | |
| 13 | 749 | Terrace (Intermediate) | 188.9 | 4.7 | 293,000 | |
| 14 | 750 | Terrace Corner | 428.7 | 10.6 | SOLD | |
| 15 | 751 | Terrace Corner | 435.6 | 10.8 | SOLD | |
| 16 | 752 | Terrace (Intermediate) | 188.9 | 4.7 | 293,000 | |
| 17 | 753 | Terrace (Intermediate) | 189.0 | 4.7 | SOLD | |
| 18 | 754 | Terrace (Intermediate) | 188.9 | 4.7 | SOLD | |
| 19 | 755 | Terrace (Intermediate) | 189.0 | 4.7 | 293,000 | |
| 20 | 756 | Terrace (Intermediate) | 189.0 | 4.7 | SOLD | |
| 21 | 757 | Terrace Corner | 345.0 | 8.5 | SOLD | |
| 22 | 758 | Terrace Corner | 433.7 | 10.7 | SOLD | |
| 23 | 759 | Terrace (Intermediate) | 230.0 | 5.7 | SOLD | |
| 24 | 760 | Terrace (Intermediate) | 229.8 | 5.7 | 293,000 | |
| 25 | 761 | Terrace (Intermediate) | 224.3 | 5.5 | SOLD | |
| 26 | 762 | Terrace (Intermediate) | 213.4 | 5.3 | SOLD | |
| 27 | 763 | Terrace (Intermediate) | 202.9 | 5.0 | 293,000 | |
| 28 | 764 | Terrace Corner | 391.4 | 9.7 | SOLD |
| A | PAYMENT SCHEDULE |
||||||
| 1. | Immediately upon the signing of the Sale & Purchase Agreement | 5% | |||||
| 2. | Within fourteen (14) days after receipt by the Purchaser of the Vendor's written notice of the completion of: | ||||||
| (a) | Foundation works | 15% | |||||
| (b) | Ground floor slab, ground floor column | 15% | |||||
| (c) | First floor slab, roof beam and walls in position | 20% | |||||
| (d) | Roofing, internal plastering, electrical conduits (without wiring) and plumbing (without fittings) | 15% | |||||
| (e) | External plastering, ceiling, doors and windows including glazing, soil, drainage and septic tank | 15% | |||||
| (f) | Driveway, apron, perimeter drain, fencing, gate and painting | 10% | |||||
| (g) | Certification of Completion by Architect | 5% | |||||
| B | NOTES | ||
| Sale and Purchase Agreement | Legal fee and Stamp Duty shall be borne equally by the Developer and the Purchaser(s) | ||
| Memorandum of Transfer | Legal fee and Stamp Duty shall be borne equally by the Developer and the Purchaser(s) | ||
| Memorandum of Charge | Legal fee and Stamp Duty fully borne by Purchaser(s) | ||
| Water and Electricity | Meter fee and Deposit fully borne by Purchaser(s) |
bravenet.com